亲亲发出吧唧吧唧的声音,美国女子监狱,av 丝袜 欧美 老 另类 亚洲,国色天香久久久久久久小说

First major tunnel over 5,000 meters drilled through along China-Laos railway

Source: Xinhua| 2019-03-21 12:51:40|Editor: xuxin
Video PlayerClose

LAOS-BOTEN-CHINA-RAILWAY-TUNNEL

Photo taken on March 21, 2019 shows the drilling-through ceremony of Boten Tunnel along the China-Laos railway in Boten of Laos. A Chinese railway engineering company on Thursday drilled through Boten Tunnel, the first major tunnel over 5,000 meters along the China-Laos railway. This marks an important milestone in the construction of the project. The Boten Tunnel, with a length of 6453.5 meters, is among the 10 major tunnels longer than five km along the China-Laos Railway. The tunnel has to pass through unfavorable geology such as karst, bedding rock, fault fracture zone, gypsum, carbon mudstone, and water inrush, and it varies, thus creating lots of difficulties to the Chinese engineering company, China Railway No. 5 Engineering Group (CREC-5). (Xinhua/Wang Jingqiang)

BOTEN, Laos, March 21 (Xinhua) -- A Chinese railway engineering company on Thursday drilled through Boten Tunnel, the first major tunnel over 5,000 meters along the China-Laos railway.

This marks an important milestone in the construction of the project. The Boten Tunnel, with a length of 6453.5 meters, is among the 10 major tunnels longer than five km along the China-Laos Railway.

Khamsouk Bounyavong, vice president of Lao People's Revolutionary Party Central Committee's Inspection Committee, and Ju Guojiang, chairman of the Laos-China Railway Co., Ltd, the joint venture in charge of the construction and the operation of the railway, attended the drilling-through ceremony in Boten on Thursday.

The tunnel has to pass through unfavorable geology such as karst, bedding rock, fault fracture zone, gypsum, carbon mudstone, and water inrush, and it varies, thus creating lots of difficulties to the Chinese engineering company, China Railway No. 5 Engineering Group (CREC-5).

The Boten Tunnel was selected to be built as a high-quality demonstration model for the railway project. Since March 2017 when the construction started, the Chinese engineers have strictly implemented the managing requirements of mechanization, industrialization, informatization and profession.

The CREC-5 strengthened the on-site safety and quality control and extensively applied tunnel construction kits, vigorously carried out scientific and technological research, actively promoted the application of new technologies, and paid close attention to process management so as to ensure the safe and orderly advancement of tunnel construction, and lay a solid foundation for the Thursday's victorious breakthrough.

The China-Laos Railway is a strategic docking project between the China-proposed Belt and Road Initiative and Laos' strategy to convert from a landlocked country to a land-linked hub.

The 414.332-km railway runs from Mohan-Boten border gate in northern Laos to the capital of Vientiane within an operating speed of 160 km per hour.

The electrified passenger and cargo railway is built with the full application of Chinese management standards and technical standards

The project started in December 2016 and is scheduled to be completed and opened to traffic in December 2021.

   1 2 3 Next  

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001379124501
主站蜘蛛池模板: 惠来县| 达州市| 象州县| 西城区| 贺州市| 苏尼特右旗| 达日县| 正阳县| 雷山县| 乐亭县| 灵武市| 开平市| 济南市| 香格里拉县| 雅江县| 隆尧县| 阿坝县| 久治县| 沙雅县| 黎城县| 潜山县| 尉氏县| 南召县| 壶关县| 台南县| 苏州市| 诏安县| 栾城县| 岳阳市| 台江县| 城固县| 瑞金市| 大姚县| 海南省| 灌阳县| 社旗县| 河东区| 谢通门县| 逊克县| 鄂托克旗| 娄烦县|